Please Help :Last Year three 6th grade students , Aliya, Crystal, And Shamika, we’re selling balloons at the schools Winter Dance to collect $305 for a class trip to the Zoo. Aliya sold 2 more balloons than Crystal, And Shamika sold twice as much balloons as Crystal. Let “C” represent the total number of balloons Crystal Sold.


Total Ballons Sold : 122


F) Which number in the following set represents the amount of balloons sold by Crystal?


{ 30, 31, 116, 118 }


Thanks

Answers

Answer 1
Answer:

the answer is 30 because Shamika sold twice as much balloons as Crystal which is 60. 30+60=90 then Aliya sold 2 more balloons than Crystal which 32+90=122


Related Questions

2.5 feet is greater than, less than, or equal to 32 inches
How many 5-digit numbers can be formed using only odd digits?
Convert the given fraction to a decimal by setting the denominator equal to 100
A piece of fabric measures 3.9 meters. express this length in meters?
What 3/8 divided by 48

What is the volume of this cylinder? (Use π = 3.14.) A. 703.36 cm3 B. 175.84 cm3 C. 50.24 cm3 D. 354.68 cm3https://static.k12.com/calms_media/media/537000_537500/537008/2/ec4c1bfa8f4ce747e7ec9428bad748c270ad4df6/62178_question.jpg

NEED ANSWER AS SOON AS POSSIBLE

Answers

So, as you should know the volume of a cylinder is  ( pi x r^2 x h ) and since it has a diameter and not the radius you would cut it in half therefore the radius is 4. 8/2=4 4*4= 16 16*14=224 224*3.14= 703.36 So, therefore your answer would be A. Hope this helps!

20 % of 2 is equal to

A. 20
B. 4
C. 0.4
D. 0.04

Answers

i think the answer is 0.4

A work crew of 3 people requires 3 weeks and 2 days to do a certain job. How long would it take a work crew of 4 people to do the same job if each person of both crews works at the same rate as each of the others. [Note: each week contains six work days]Thanks for the help!

Answers

It would take a work crew of 4 people approximately 5 days and 18 hours to complete the same job if each person in both crews works at the same rate as each other.

To solve this problem, we can start by calculating the total work done by the original work crew of 3 people in terms of "work-weeks." We know that they require 3 weeks and 2 days to complete the job.

1 week = 7 days

So, 3 weeks and 2 days can be converted to days as follows:

3 weeks + 2 days = 3 weeks + (2/7) weeks

≈ 3 weeks + 0.2857 weeks

≈ 3.2857 weeks

Now, we know that the original work crew of 3 people completes the job in 3.2857 work-weeks.

Next, we can calculate the amount of work done by each person of the original crew per work-week:

Work done by 1 person in 1 week = 1/3 of the total work (as there are 3 people)

Work done by 1 person in 1 work-week ≈ 1/3.2857

Now, we want to find out how much work a single person of the new work crew of 4 people can do in 1 work-week. Since each person in both crews works at the same rate, the work done per person per week will be the same.

Work done by 1 person in 1 work-week ≈ 1/3.2857 ≈ 0.3043

Now, we know that a single person from the new crew can complete approximately 0.3043 of the total job in one work-week.

Finally, we want to find out how long it will take for the new work crew of 4 people to complete the entire job. Let's denote the time in weeks as "x."

Total work done by the new crew of 4 people = 4 people * x weeks * 0.3043 work done per person in 1 week

Total work done by the new crew of 4 people = 1 job (as they will complete the entire job)

So, we have the equation:

4x * 0.3043 = 1

Now, solve for "x":

x ≈ 1 / (4 * 0.3043)

x ≈ 0.8225

Therefore, it would take a work crew of 4 people approximately 0.8225 weeks to do the same job. To convert this into days:

0.8225 weeks * 7 days/week ≈ 5.7575 days

So, it would take a work crew of 4 people approximately 5 days and 18 hours to complete the same job if each person in both crews works at the same rate as each other.

For more details of  work crew:

brainly.com/question/20323478

#SPJ2

20  days per 3 people         for 4 people


20/3 * 4 = 26 & 2/3 days

If the ratio of the purple flowers to black flowers is 4 to 8 and there are a total of 108 flowers how many of the flowers are purple

Answers

Ok let's see.

The way to tackle this, is to first add up the ratio's.

So 4+8 = 12. Now this 12 is important as this is total number of shares (bunches) we need to allocate to 2 different flower colours.

Before we can know how much flowers = 4 and 8 bunches. We first need to work out how many flowers = 1 bunch.

It's simple.

108 (total number of flowers) ÷ 12 (bunches of flowers) = 9 flowers per bunch.

So if 1 bunch = 9 flowers.

4 : 8

= (4 bunches x 9 flowers) : (8 bunches x 9 flowers)

Which leads to...

36 purple : 72 black
Purple flowers: black flowers = 4:8 = 108

4 + 8 = 12

108 / 12 = 9. 

9 x 4 = 36. 

36 of the flowers are purple. 

Can you please help me ???

Answers

Answer:

1. 64

2. 81

3. 25

4. 27

5. 63

6. 27

7. 22

8. 16

9. 41

10. 25

11. 8

12. 24

13. 90

14. 24

15. 30

16. 38

17. 51

18. 18

19. 33

20. 12

21. 17

22. 28

23. 70

24. 67

25. 13

26. 20

The inequality 6(x + 2) > 7(x − 5) is equivalent to which of the following inequalities?A. x < −23
B. x < 07
C. x < 17
D. x < 37
E. x < 47

Answers

6(x + 2) > 7(x-5)\n \n6x+12>7x-35 \n \n 6x-7x >-35-12\n \n-x>-47 \ \ /\cdot (-1)\n \nx< 47 \n \nAnswer : \ E. \ \ x < 47
6(x+2) > 7(x-5)
6x +12>7x-35
6x-7x > -35 -12
-x > - 47
x < 47      =  E