2X + 2 wht is the value of X
2X + 2 wht is the value of X - 1

Answers

Answer 1
Answer: Ultimately, it is impossible to solve an equation without two sides. If it was 2X=2, the answer would be X=1. But if it was 2X+2=0, the answer would be X=-1. The information given is impossible to work with,

Related Questions

write an equation with the solution x=20. The equation should have the variable on both sides, a fractional coefficient on the left side, and a fraction anywhere on the right side
Rise over run please?????????
If the y = ( x - 6)( x + 12) is graphed in the xy – plane, what is the x-coordinate of the parabola’s vertex?Please with steps and formula thx!
What is 23/24 as a decimal rounded to the nearest hundredth?
6x + y = 4 X - 4y = 19 Solving systems by substitution

Decomposers could be considered a special kind of consumer. Why??

Answers

Decomposers break down things that aren't usable anymore or that die and recycle it back into the environment to use in other processes.

7wk is less than 52days

Answers

Yes,there is 7 days in a week,so you can multiply 7 days by 7 weeks..So 7*7=49.
So 49 days is less than 52 days.

16,900,000 in scientific notation

Answers

16,900,000 in scientific notation is 16.9 times 10^7.

When you move the decimal point to the 1, it goes 7 spaces to the left, so the exponent will be a positive 7.

The telephone rates between your city and the city where your brother lives are $.54 for the first minute and $.22 for each additional minute. Calculate the cost of a 10-minute call to your brother.

Answers

The first minute costs $0.54.
From the second minute to nine minutes, each minute costs $0.22.
Therefore, the total cost within 10 minutes is
$0.54 + 9($0.22) = $2.52

a manufacturer can produce 112 shirt per hour. if a work day is 8 hours, how many shirts can be produced in 3.5 days

Answers

There are 3,136 shirts produced in 3.5 days.

Given that,

A manufacturer can produce 112 shirts per hour.

And, the working hours in a day = 8

Now, the total number of working hours in 3.5 days is,

8 × 3.5

= 28 hours

Since A manufacturer can produce 112 shirts per hour.

Hence, the total number of shirts produced in 3.5 days is,

28 × 112

= 3,136

Therefore, it can be produced 3,136 shirts in 3.5 days.

Learn more about the multiplication visit:

brainly.com/question/10873737

#SPJ5

3136, You multiply 112 by eight (Shirts per hour) and multiply that by 3.5 (Three and a half days).

Find n.
30/38= 15/n
n=______

Answers

multiple 38 with 15 and divide the result with 30 n = 19

Answer:

19

Step-by-step explanation: