When an emergency vehicle approaches you from in front or behind you, what should you do?

Answers

Answer 1
Answer:

Answer:

Pull over to the edge of the roadway, clear of intersections, and stop.

Remain there until the emergency vehicle has passed. ...

Keep a foot on the brake so the brake lights let emergency vehicle drivers know you have stopped.

Explanation:


Related Questions

A _____ is a technician who specializes in repairing and rebuilding engines
4 ft – 6 ½ in. to inches. Record your answer in fractional inches.
Which type of change is a force that drives globalization
9. A flashing red traffic signal at an intersection has the same requirements as:A slow sign.A yield sign.A stop sign.An intersection sign.
I speak without a mouth and hear without ears. I have no body, but I come alive with wind. What am I? its a riddle

Match the descriptions to the respective stage of team development
forming stage
storming stage
norming stage
performing stage

The team transitions into this stage after completion of its first successful project.

In this stage, the team members come together for the first time.

In this stage, the members have a better idea of what the team expects of them.

In this stage, comfort and trust between the members is high.

Answers

The descriptions of team development when matched correctly with the options are;

The descriptions of the respective stages of team development when matched correctly are;

1) Forming Stage; In this stage, the team members come together for the first time. 2) Storming Stage; In this stage, the members have a better idea of what the team expects of them.

3) Norming Stage; In this stage, comfort and trust between the members is high.

4) Performing Stage; The team transitions into this stage after completion of its firstsuccessful project.

In team development it involves learning together and there are 5 stages known as;

- Forming Stage

- Storming Stage

- Norming Stage

- Performing Stage

- Adjourning Stage

  • 1) Forming Stage; This is the first stage and it is the stage where people meet for the first time for orientation and getting well acquainted with the task at hand.

  • 2) Storming Stage; This is the secondstage and it is the stage where ideas are exchanged and as a result the team comes to an understanding of what is expected of them.

  • 3) Norming Stage; This is the third stage after individual differences have been ironed out and the idea of what they want to do is clear and as a result, there is a better level of comfort and trust among the members.

  • 4) Performing Stage; This is the fourthstage where every planning has been completed and they execute their first successful project.

Read more at; brainly.com/question/3430990

Answer:

The team transitions into this stage after completion of its first successful project.

norming stage

In this stage, the team members come together for the first time.

forming stage

In this stage, the members have a better idea of what the team expects of them.

storming stage

In this stage, comfort and trust between the members is high.

performing stage

Explanation:

I just did the test

There's supposed to be a browser that's called WebExplorer. I need it for my school. But I accidentally uninstalled it and now I don't know where or how to install it again. Can anyone tell me a website which features this browser? I really need it for school. Thanks.

Answers

Answer:

You got to this website using a search engine right? Search for it on your search engine and it should pop up for you to install it.

Explanation:

What is something all behavior has?

Answers

Answer:

All behavior is acquired

Explanation:

What is the purpose of an engineering notebook?ОА. .
to record the design process
OB.
to record the manufacturing process
OC.
to record the brainstorming discussions
OD.
to record the performance of the prototype
O E.
to record the ideation process

Answers

A. To record the design process. This is for many reasons, but primarily to track development overtime and show that development to someone.

Which material has taken the place of many other materials over thelast 100 years?
metal
wood
plastic
ceramic

Answers

Answer:

I think the answer is plastic. If i am wrong i am sorry.

Explanation:

Plastic has been seen more often around this time, so thats why i think its plastic.

The answer should be plastic.
Plastic is cheap to make and can substitute many materials in different products, reducing cost and increasing productivity.

What is the only completely reliable method for preventing backflow?

Answers

Answer:

An air gap is the only completely reliable method for preventing backflow.