What is the measure of ∠M?A.
53°

B.
65°

C.
81°

D.
98°
What is the measure of ∠M? A. 53° B. 65° - 1

Answers

Answer 1
Answer: The shape is a quadrilateral, because it has four sides.

And sum of angles in a quadrilateral = 360 degrees.

The angle with no number but just a symbol = 90 degrees.

From the  fourth angle been  M:

Therefore:  90 + 62 + 127 + M = 360

279 + M = 360

M = 360 - 279

M = 81

M = 81°

Option C.

I hope this explains it.

Related Questions

Simplify 3​
Irina predicted that she would sell 75 books, but she actually sold 95 books. Which expression would find the percenterror? Use the table below to help answer the question Percent Error Item Books Approximate value 75 Exact value 95 Ratio Error -20 Absolute error 20 Percent error (100) . 元 (100)
If minor arc AB measures 9 inches, what is the length of the radius of circle C?
Which of terms could be added to √5?
Which list shows the numbers in order from least to greatest?3ş, 37, 3.65

A coin is tossed and a fourth section spinner is spun once a tree diagram shows the possible outcomes for the two events what is the probability of flipping tails on a coin and spinning a two on the spinner

Answers

Answer:

2/6 or 1/3 I think

Step-by-step explanation:

you have a 1 out of 2 chances to land tails and 1 out of 4 chance to role a 2 on the spinner. so in total there is 6 chances for rolling and flipping the coin. and there is only 1 chance for both in the odds.

therefore I believe that its is 1/3 or 2/6. I do not know if I am right exactly but that is my thought process.

What is the probability that the project will take more than 30 days to complete? (Use Excel's NORMSDIST() function to find the correct probability for your computed Z-value. Other than the expected completion time you entered in part c above, do not round intermediate calculations. Round "z" value to 2 decimal places your final answer to 4 decimal places.)ver ratio

Answers

Answer:

z = -3.73

Probability = P(z<-3.73) = 9.48761E.05

Step-by-step explanation:

Detailed explanation is given in the attached document.

The probability that the project will take more than 30 days to complete can be found using the NORMSDIST() function in Excel, and it depends on the z-score associated with the project's completion time distribution.

To find the probability that a project will take more than 30 days to complete using the normal distribution, you'll need to follow these steps:

1. Calculate the z-score for 30 days using the formula:

  Z = (X - μ) / σ

  Where:

  - X is the value you're interested in (30 days in this case).

  - μ is the mean completion time (expected completion time).

  - σ is the standard deviation of completion times.

2. Once you have the z-score, use Excel's NORMSDIST() function to find the probability associated with that z-score.

Here's a hypothetical example of how to do this:

Let's say the expected completion time (mean) for the project is 25 days, and you have a standard deviation (σ) of 5 days. Now, calculate the z-score:

Z = (30 - 25) / 5

Z = 1

Now, use Excel's NORMSDIST() function to find the probability associated with a z-score of 1:

`=1 - NORMSDIST(1)`

This formula will give you the probability that the project will take more than 30 days to complete.

Make sure to replace the mean (25) and standard deviation (5) in the formula with the actual values from your project data. Additionally, round the z-score to two decimal places and the final answer to four decimal places, as requested in your question.

Learn more about Probability here:

brainly.com/question/22962752

#SPJ3

Find the slope of the line that asses through the pair of oints (17,11) and (21,19)

Answers

Answer:

The slope of the two points is 2. (8/4)

Answer:

The slope of the two points is 2. (8/4)

Step-by-step explanation:

thats it

18 pieces of wood each are 1 4/9 feet long what is the total length of wood needed

Answers

Answer:

A

Step-by-step explanation:

hope this help

Find the value of the expression: 70–a^2 for a=–25; 1; 10

Answers

Answer:

  • a = -25: -555
  • a = 1: 69
  • a = 10: -30

Step-by-step explanation:

Put the value where "a" is in the expression and do the arithmetic.

  1. For a = -25: 70 - (-25)² = 70 - 625 = -555
  2. For a = 1: 70 - (1)² = 70 - 1 = 69
  3. For a = 10: 70 - (10)² = 70 - 100 = -30

_____

If you're unsure of your own arithmetic skills, you can always use a calculator.

Students are asked to memorize a list of 100 words. The students are given periodic quizzes to see how many words they have memorized. The function L gives the number of words memorized at time t. The rate of change of the number of words memorized is proportional to the number of words left to be memorized. 1. Which of the following differential equations could be used to model this situation, where k is a positive constant?
A. dL/dt = kL
B. dL/dt = 100 - kL
C. dL/dt = k(100 - L)
D. dL/dt = kL - 100

Answers

Answer:

C. dL/dt = k(100 - L)

Step-by-step explanation:

We have a list containing 100 words.

L = number of words memorized at time t.

At any time t, the number of words left to be memorized is 100-L.

Therefore:

(dL)/(dt)\propto 100-L\n $Introducing k, a constant  of proportion$\n(dL)/(dt)= k(100-L)

The correct option is C.