An advertising agency is estimating costs for promoting a music festival. The job will require 200 direct labor hours at a cost of $50 per hour. Overhead costs are applied at a rate of $65 per direct labor hour.1. What is the total estimated cost for this job?
2. If the company applies a markup of 20% of total costs (price quote is 120% of total costs), what price should it quote for this job?

Answers

Answer 1
Answer:

Answer:

$23,000 and $27,600

Step-by-step explanation:

To find the total cost of the job, we do the equation: $50 x 200

This equation will calculate the cost of the direct labor.

$50 x 200 = $10,000

Now, calculate the overhead prices

The equation is 200 x $65

This equals 13,000

Now add them and you get 23,000

The cost of the job is $23,000

To find the markup, 1.2 x $23,000 = $27,600


Related Questions

What is the x-and y-intercept of the graph 4x -5y =40??
Mikey bikes 12 miles in 2 hours. How many miles does Mikey bike in an hour?
If you get this you are a critical thinker. I enter the garden. There are 34 people. You kill 30. How many people are in the garden. Good luck! If you get it correct your answer will be deleted and l will message you to continue the game.​
140,000 = 1.4 x 105TrueO False
You are given the probability generating function of X: PX(z)=(0.8z+0.2)10 Calculate the coefficient of variation of X.

PLEASE HELP! How do I solve this problem?

Answers

Answer:

A= -10 B= 1/2 C= 600

Step-by-step explanation:

c'est tous simplement la bonne réponse

Create a set A with multiples of 5 that are less than 33.

Answers

Answer:

A={5,10,15,20,25,30}

Step-by-step explanation:

Theres no explanation

A construction company can remove 3/4 tons of dirt from a construction site each hour. how long will it take them to remove 36 tons of dirt from the site? (Answer needs to be in simplest form)

Answers

It will take the construction company 48 hours to remove 36 tons of dirt from the site.The construction company can remove \( \frac{3}{4} \) tons of dirt from the site each hour.

To find out how long it will take them to remove 36 tons of dirt, we can set up a proportion

\(\frac{\text{Amount of dirt removed}}{\text{Time}} = \frac{\text{Amount of dirt removed}}{\text{Time}}\)

Given:Amount of dirt removed in one hour = \( (3)/(4) \) tons

Total amount of dirt to be removed = 36 tons

Let  t  represent the time in hours it will take to remove 36 tons of dirt. Plugging in the values:\(((3)/(4))/(1) = (36)/(t)\)

Solving for \( t \): \(t = (36)/((3)/(4)) = (36 * 4)/(3) = 48\)hours

So, it will take the construction company 48 hours to remove 36 tons of dirt from the site.

To know more about construction:

brainly.com/question/33434682

#SPJ3

Answer:

48hours

Step-by-step explanation:

36÷(3/4)

36*(4/3)

144/3

48

What's the elapsed time between 3:40 A.M. and 2:00 P.M.? A. 8 hr. 20 min.
B. 1 hr. 40 min.
C. 10 hr. 20 min.
D. 11 hr.

Answers

I can not be B that is for sure It is C hoped that helped
The answer is C. 10 hours and 20 minutes.

Other than a desktop computer, laptop, tablet, or Smartphone, discuss two other ways computer technologies are used in our daily lives

Answers

Answer:

Smart TV, Smart Navigation in cars

Step-by-step explanation:

Smart TV :

  • Today Television has evolved to be integrated with computer technology
  • It comes integrated with Android software.
  • It can be now connected with internet to watch any type of content by connecting TV with internet

Smart navigation in cars:

  • Computer technologies are used in car also
  • Car system is embedded with computer technologies which not only helps in finding location and traffic of place
  • it also helps in parking of car as well (backward moving)

Graph the line 3x + 6y =12.

Answers

Answer: Slope=−  2.000/1.000  =−0.500

x−intercept=  1/4  =4.00000

y−intercept=  2/4  =2

Step-by-step explanation: Rearrange the equation by subtracting what is to the right of the equal sign from both sides of the equation :

3*x+6*y-(12)=0

Pull out like factors :  3x + 6y - 12  =   3 • (x + 2y - 4)

Solve :    3   =  0

A a non-zero constant never equals zero.

Solve   x+2y-4  = 0

Tiger recognizes that we have here an equation of a straight line. Such an equation is usually written y=mx+b ("y=mx+c" in the UK).

"y=mx+b" is the formula of a straight line drawn on Cartesian coordinate system in which "y" is the vertical axis and "x" the horizontal axis.

In this formula :

y tells us how far up the line goes

x tells us how far along

m is the Slope or Gradient i.e. how steep the line is

b is the Y-intercept i.e. where the line crosses the Y axis

The X and Y intercepts and the Slope are called the line properties. We shall now graph the line  x+2y-4  = 0 and calculate its properties

Notice that when x = 0 the value of y is 2/1 so this line "cuts" the y axis at y= 2.00000

 y-intercept = 4/2  =  2

When y = 0 the value of x is 4/1 Our line therefore "cuts" the x axis at x= 4.00000

 x-intercept = 4/1  =  4.00000

Slope is defined as the change in y divided by the change in x. We note that for x=0, the value of y is 2.000 and for x=2.000, the value of y is 1.000. So, for a change of 2.000 in x (The change in x is sometimes referred to as "RUN") we get a change of 1.000 - 2.000 = -1.000 in y. (The change in y is sometimes referred to as "RISE" and the Slope is m = RISE / RUN)

   Slope     = -1.000/2.000 = -0.500

 Slope = -1.000/2.000 = -0.500

 x-intercept = 4/1 = 4.00000

 y-intercept = 4/2 = 2