Which of the following is most likely to be used in a garment factory to solve problems like defective inputs, broken machine parts, or a worker''s lack of skills to product a specific type of garment?

Answers

Answer 1
Answer: concurrent control would be taken

Related Questions

Write your question here (Keep it simple and clear to get the best answer)if you. Were appointed as a South African press associated president, discuss five corrective measures you would take to address such a situation?
Plese give three examples of specilized servers.
Why are ports needed to program applications and edpoints?
What are some pros and cons of being a Computer Hardware Engineer?
You are in charge of recycling computers. some of the computers have hard drives that contain personally identifiable information (pii). what should be done to the hard drive before it is recycled?

You have just performed a cpm analysis and have found that more than one path through the project network has zero slack values. What can you conclude?

Answers

Answer:

There are multiple critical paths

Explanation:

The critical path method (CPM), or critical path analysis (CPA), is an algorithm for scheduling a set of project activities. It is commonly used in conjunction with the program evaluation and review technique (PERT). A critical path is determined by identifying the longest stretch of dependent activities and measuring the time required to complete them from start to finish.

The essential technique for using CPM is to construct a model of the project that includes the following:

  •    A list of all activities required to complete the project (typically categorized within a work breakdown structure),
  •    The time (duration) that each activity will take to complete,
  •    The dependencies between the activities and,
  •    Logical end points such as milestones or deliverable items.      

Using these values, CPM calculates the longest path of planned activities to logical end points or to the end of the project, and the earliest and latest that each activity can start and finish without making the project longer. This process determines which activities are "critical" (i.e., on the longest path) and which have "total float" (i.e., can be delayed without making the project longer).

considering the above function of the cpm analysis because you have multiple path, there is tendency that more than path through the project network will have zero slack values.

You can use a what to test tread wear on your tires

Answers

To test the tread wear on tires you can use a Penny or a Quarter! :)

Which statement is true? A. Since my credit score is going to impact my freedom, my job, and my goodie collection, I should start thinking about my credit score now. B. Credit scores don't have anything to do with me yet. After my thirtieth birthday, that's when I'll worry about credit scores.

Answers

A. Since my credit score is going to impact my freedom, my job, and my goodie collection, I should start thinking about my credit score now.
Well you start to have credit when you turn 18 and get a credit card. so i would start thinking about how your going to save money right now

A(n) ____ is a set of computer instructions.

Answers

A[n] program is a set of computer instructions.

In Vista and Windows 7, the Appearance and Personalization option allows you to change theA. keyboard speed.
B. small icons.
C. background.
D. mouse properties.

Answers

Answer= background
Appearance of the laptop is called theme, it is also related to background

Which mineral is commonly found in igneous rocks?

Answers

Answer:

I would say Quartz.

Explanation:

Answer:

felspar

Explanation: