Jason works for a restaurant that serves only organic, local produce. Whattrend is this business following?

Answers

Answer 1
Answer:

Answer: Green business

Explanation:

Green business is also referred to as the sustainable business, and it's a business which has a minimal negative impact on the environment.

Green industry businesses aim to use little energy, water, and other resources while cutting carbon emissions. The resources that are used are utilized in eco-friendly ways.

Since Jason works for a restaurant that serves only organic, local produce, the business can said to be a green business.


Related Questions

The four general functions of any application program are: data storage, data access logic, application logic and presentation logic. True False
What do we do with our "points" on this site?
When you assign a(n) ____ to a field, Access will display the value you assign, rather than the field name, in datasheets and in forms.?
Programming is the process of ________. Select one: a. gathering and organizing information from users and managers b. testing the integration of multiple modules of a system c. transforming raw data inputs into new or modified information d. testing the correctness of individual modules of a system e. transforming the system design into a working computer system
How would be the human life in the absence of technology

The home keys on the numeric keypad are _____. 123 456 789 0+-

Answers

The home keys for the numeric keypad are 4 5 6

The fingers (Index, middle, and ring), on your right hand should always start on the 4 5 6 keys respectively. These keys are the home row keys for your numeric keypad. Each finger placed is responsible for a column of keys. For example, the middle finger is responsible for all the keys that lie in that column.


you are supposed to rest your fingers on 456.

Your networking contact list should be limited to family members.
a. True
b. False

Answers

The statement that your networking contact list should be limited to family members is false. The term networking contact denotes professional contacts. Your networking list should include: connectors, experts in your filed, alumni or career services and people who support you.

The answer is B. False

How does object-oriented programming work in Python?

Answers

So basically you have a class, and within that class you have methods and instance variables; very much like how object oriented programming works in other languages. However, the main difference is that the class constructor in Python is defined right within the class object and is denoted by the method name, "__init__" and requires a parameter of "self". 
Ex:
class Py:
    def __init__(self):
          constructor code...
The __init__ method is what is called first when an object of the class is instantiated. The way you instantiate an object is by the following:
object_name = Py()

If you wanted to make your class more useful, you could add more parameters to your __init__ constructor, so when an object is created you can pass arguments to that object:
class Py:
    def __init__(self, name, age):
         self.name = name
         self.age = age
         print "Your name is %s and you are %d years old" % (name, age)
def main():
     Bob = Py("Bob", 23)
if __name__ == "__main__":
     main()

This code would give you: Your name is Bob and you are 23 years old

An intranet is a way for a company or organization to protect copyrighted and other important information?

Answers

Note that an intranet is a private network contained and used only by an organization.

True is your answer, for only the people who have access to it, are ablt to access the information.

hope this helps

If this is true or false, it would be true

Hope this helps

-AaronWiseIsBae

You have just performed a cpm analysis and have found that more than one path through the project network has zero slack values. What can you conclude?

Answers

Answer:

There are multiple critical paths

Explanation:

The critical path method (CPM), or critical path analysis (CPA), is an algorithm for scheduling a set of project activities. It is commonly used in conjunction with the program evaluation and review technique (PERT). A critical path is determined by identifying the longest stretch of dependent activities and measuring the time required to complete them from start to finish.

The essential technique for using CPM is to construct a model of the project that includes the following:

  •    A list of all activities required to complete the project (typically categorized within a work breakdown structure),
  •    The time (duration) that each activity will take to complete,
  •    The dependencies between the activities and,
  •    Logical end points such as milestones or deliverable items.      

Using these values, CPM calculates the longest path of planned activities to logical end points or to the end of the project, and the earliest and latest that each activity can start and finish without making the project longer. This process determines which activities are "critical" (i.e., on the longest path) and which have "total float" (i.e., can be delayed without making the project longer).

considering the above function of the cpm analysis because you have multiple path, there is tendency that more than path through the project network will have zero slack values.

How all wheel drive works

Answers

Yani cnm bu senin kararin istegidiin gibi davranBasarilar